Our quality approach covers material and assembly checks, product inspection and documentation. Tell us your acceptance requirements so we can review which checks and documents apply to your equipment.
Material & process checks · Product-specific verification · Agreed document list
Transformer test area
Use the same product requirements for manufacturing and inspection. Agree the checks, acceptance criteria and records needed at each stage.
Specify which materials and components need to be checked before the relevant production stage.
Items, specifications and records to agree.
Specify checks for assemblies and semi-finished components during production, in addition to the final inspection.
Control points and acceptance criteria to agree.
Agree the inspections and tests for the product, model and configuration in your order.
Methods, frequency and results to record.
Agree which records and documents are needed for inspection acceptance and delivery.
Required documents and identification to agree.
Inspection requirements vary by product. Instrument transformers, complete switchgear and power transformers each need their own control plan.
Review the sealing interfaces, operating mechanisms and interlocks used in the switchgear. For each check, identify the assembly, acceptance criteria and record required.
Check the sealing components and their installation requirements. A sealing-component check alone does not establish a gas-tightness test result.
Specify the opening, closing and linkage checks for the switch or breaker assembly.
Review the interlocks used in the equipment. In the instrument-transformer production example, inspection follows primary and secondary coil winding.
Select your product group to see which inspection requirements to discuss. Each equipment family needs its own checklist.
Use the table to discuss which inspections your order requires.
Sealing components, bushings and relevant assembly interfaces.
Identify the model, inspection method and record.
Mechanism checks and opening-and-closing linkage in the relevant assembly.
Agree the required operating checks and criteria.
Applicable door and operating interlocks.
Confirm the interlock arrangement and verification record.
Agree the inspection items, frequency, acceptance criteria and records for the product in your order.
Use the table to discuss which inspections your order requires.
Transformer type, model, ratings and configuration.
Match the inspection requirements to the equipment in your order.
Project-required inspections and applicable product tests.
Request the test list, basis, frequency and a sample record.
Reports and records required for the specified product.
Agree the document scope before acceptance.
Agree the inspection items, frequency, acceptance criteria and records for the product in your order.
Use the table to discuss which inspections your order requires.
Drop-out fuses, vacuum circuit breakers, disconnectors or earthing switches.
Identify the actual model and intended application.
The component or equipment inspection requirements.
Agree a test plan for the selected product. A switchgear checklist needs to be adapted before use with other equipment.
Documents required by the project for the specified model.
Check the named product, configuration and document coverage.
Agree the inspection items, frequency, acceptance criteria and records for the product in your order.
During technical review, specify the documents you need for the equipment being built. Availability and content depend on the product and order.
Describe the equipment as specified.
Show the checks performed and their results.
List the information required at handover.
Confirm the final document list and how each document will be identified for your order.
Request the certificate or test document for your equipment. Check the named company, product and configuration, along with the document scope and validity.
01Certificate holder and covered manufacturing location
02Named product family, model or configuration
03Document number, issuer and applicable scope
04Issue date, validity and current document version
05How the document relates to the purchase requirements
Before handover, agree who will participate in inspection, which records are required and how any issues will be resolved.
Send the product or model, project specification, required inspection items, acceptance criteria and document list. State whether the customer or a third party needs to participate.
Include the request in your enquiry. The product scope, witness arrangements, timing and records must be reviewed and agreed for your order. Witnessed inspection and FAT are not included automatically.
Confirm the document list for your equipment and order. Check the named entity, model, configuration and coverage on each document. A certificate logo alone does not establish that coverage.
Agree how the issue will be recorded, how corrective action will be evaluated and when reinspection is required. During the review, identify the responsible contacts and the records needed to close the issue.
Tell us the product, inspection criteria and documents your project requires. These details need to be agreed before the production and acceptance arrangements are finalized.
Include the product or model, inspection criteria, required documents and any witness arrangements.
Attach drawings or specifications to your email.