OEM / ODM SERVICES

OEM & ODM
transformers
and switchgear.

Equipment configured for your site, your specified components and your brand. Send us your drawings or start with an application brief.

Example of an MNS low-voltage switchgear assembly
S11-M Oil-Immersed Distribution Transformer product photograph

TRANSFORMERS + SWITCHGEAR

Configuration varies by project.

OEM

Have an approved specification?

Send your drawings, ratings and branding requirements for a production review.

ODM

Need configuration support?

We review your application with manufacturing partners and define any development work.

01 / CUSTOMIZATION

Configure for
the installation site.

Share the site conditions. We review cooling, corrosion protection and insulation for the proposed equipment.

  • Maximum ambient temperature
  • Altitude and humidity
  • Pollution severity IEC 60815, where applicable
55°C

AMBIENT TEMPERATURE

Enhanced transformer cooling

For Middle Eastern projects with 55°C requirements. Load capability and cooling are confirmed for the selected design.

HUMID ENVIRONMENTS

Protection for switchgear

Upgraded corrosion treatment and extended creepage for Southeast Asian sites, reviewed against the specified exposure.

Branding & finish

Your logo and technical data on nameplates, neutral packaging without factory branding, and custom colors for enclosures and transformer tanks. Required technical markings are retained.

Specified components

Schneider Electric, ABB or Siemens breakers, subject to model compatibility and availability. Alternatives require your approval.

02 / MANUFACTURING

Production to the
approved configuration.

Production equipment in the supplied power transformer catalog
Transformer production · reference photo

Transformer production

Cooling, connections and tank finishes follow the approved specification. We review the load, site conditions and installation interfaces before production.

Rows of switchgear cabinets in an assembly area
Switchgear assembly · reference photo

Switchgear assembly

Enclosures, switching devices and specified components follow the agreed layout. Component models, drawings and artwork remain under configuration control.

03 / QUALITY ASSURANCE

Three-stage
quality control.

A designated transformer test area pictured in the supplied catalog
Testing-area reference

Every product follows IQC, IPQC and FAT.

IQC

Incoming inspection

Materials and components are checked before they enter production.

IPQC

Key manufacturing steps

In-process inspection checks work against approved drawings and process requirements.

FAT

Factory acceptance testing

Every product undergoes FAT before packaging, against the agreed acceptance criteria.

Test scope is confirmed for the equipment and configuration.

Included with every shipment

FAT report   ·   Packaging inspection photos

Independent inspection for large projects

We can arrange SGS, Bureau Veritas or an inspector you appoint. Agree the inspection scope and witness points during order review.