Request a Quote
Share your product list, technical ratings, quantity and delivery destination.

Combine a three-phase vacuum switching unit with electronic protection and reclosing control for distribution automation. Select the SQ voltage version and confirm the controller functions, auxiliary supply and network interfaces as one coordinated package.
Combine a three-phase vacuum switching unit with electronic protection and reclosing control for distribution automation. Select the SQ voltage version and confirm the controller functions, auxiliary supply and network interfaces as one coordinated package.
The SQ assembly pairs a three-phase vacuum switching unit with electronic protection and reclosing control. Select one voltage version and confirm the switching unit, controller and auxiliary power as a coordinated package. The controller configuration defines protection settings, reclosing sequence, lockout behavior and remote interfaces. These functions need to match the feeder coordination study.
| Electrical parameter | Specification |
|---|---|
| Model family | SQ automatic recloser |
| Voltage version designations | 15.5 kV; 22(24) kV; 33(38) kV |
| Rated current | 800 A |
| Rated short-circuit breaking current | 16 kA |
| Rated short-time withstand current | 16 kA; confirm duration for the selected version |
| Lightning impulse levels | 110 / 150 / 200 kV for the respective listed versions |
| One-minute power-frequency withstand | 50 / 60 / 70 kV for the respective listed versions |
| Rated frequency | Confirm the selected 50 or 60 Hz version |
| Controller selection | HLC6130 configuration to be agreed with the switching unit |
Confirm the selected assembly, component ratings and verification documents. Family options do not describe every supplied configuration.
Match the equipment configuration to the circuit duty and installation interfaces.
| Selection item | Specification / requirement |
|---|---|
| Switching unit | Select voltage version, insulation level and mounting arrangement |
| Protection and reclosing control | Define enabled functions, settings, sequence and lockout requirements |
| HLC6130 controller | Confirm the selected hardware, firmware and required control functions |
| Auxiliary supply | Define control power, charging and backup requirements |
| Communications | Specify the actual protocol, port and remote-control requirements |
Confirm the selected order code and component schedule before approval.
Provide the feeder study and upstream/downstream protective-device information before setting the control.
Specify the permitted sequence, dead times, lockout conditions and remote-control policy for the utility.
Agree required measurements, status signals, alarms and control interfaces.
Verify the supplied hardware, settings and functional tests against the approved project procedure.
Functional overview only. Qualified personnel must follow the approved isolation procedures and supplied operating instructions.
Define the equipment duty and interfaces before requesting the project configuration.
| Configuration item | Purpose | Define for your project |
|---|---|---|
| Vacuum switching unit | Switch load and interrupt the specified fault duty | Voltage version, current and fault level |
| Protection and reclosing | Apply the approved feeder operating policy | Functions, settings, sequence and lockout |
| Controller and power | Operate and monitor the unit | Hardware, auxiliary supply and backup |
| Remote interface | Connect the selected automation system | Protocol, physical interface and signal list |
| Mounting package | Fit the installation structure | Pole details, brackets and cable lengths |
Final components and scope of supply are defined in the project quotation.
| Interface | Reference / requirement | Selection note |
|---|---|---|
| Pole mounting | Project-specific bracket and support arrangement | Provide pole and installation details |
| Primary terminals | Confirm terminal orientation and conductor connection | Coordinate phase clearances and loading |
| Controller enclosure | Confirm mounting, access and cable entry | Provide control-box location |
| Interconnection cable | Select cable type, length and connectors | Coordinate switch-to-controller routing |
| Maintenance space | Allow access to mechanism, controller and connections | Approve the installation drawing |
Use the approved project drawing for dimensions, clearances, foundations and connections.
Provide system voltage, frequency, fault level, earthing arrangement and feeder duty.
Approve pole attachment, terminal connections, clearances and support loads.
Check the auxiliary supply, backup requirements, interconnection and communication equipment.
Request corrected configuration-specific ratings, dimensions, control documentation and test records.
| Condition | Requirement / project input |
|---|---|
| Installation duty | Distribution-feeder switching and automation |
| Site conditions | State altitude, temperature, pollution and wind or ice exposure |
| Enclosure protection | Confirm separately for the switching unit and controller |
| Electrical environment | Provide insulation and surge-protection requirements |
| Control environment | Confirm supply quality, backup duration and communications |
Provide any conditions outside the stated range before ordering. Final suitability requires project-specific confirmation.
Match interruption and withstand duty to the network, then coordinate the selected protection and reclosing settings.
Specify remote commands, status signals, measurements and communications for the selected controller hardware and firmware.
Planning example: a feeder needs electronic protection and a utility-defined reclosing sequence. The switching unit and controller are approved together.
Provide system voltage, current, fault level and insulation requirements for one SQ version.
Provide the coordination study, permitted sequence, dead times and lockout conditions.
Confirm auxiliary power, controller hardware and firmware, communications and the required functional tests.
Production follows the approved drawings, the applicable product standards and the agreed inspection plan.
We can adjust the configuration for your operating environment and provide neutral packaging or your logo. Send the site conditions and branding requirements with your enquiry.
Incoming components, production work and finished units are checked against the requirements for the ordered configuration.
Incoming materials and components are checked against the approved specifications before production.
Assemblies and semi-finished components are inspected at the relevant production stages.
Finished equipment and release records are checked against the approved order requirements.
Factory acceptance testing (FAT). Every unit undergoes FAT before packing. Test items and acceptance criteria follow the product and approved configuration. FAT reports and packing inspection photos accompany the shipment. Factory attendance, video witnessing or independent inspection can be arranged with an agreed scope and schedule.
Explore related guides for product selection, specifications and project planning.
Review interruption steps, main components and protection roles.
The quotation must identify the switch body, controller, interconnection cable, mounting parts and accessories. Confirm the complete package before order.
HLC6130 is the documented control option. Confirm the required version, functions, interfaces and compatibility with the selected switching unit.
No. Specify the required protocol and interface; confirm the actual controller hardware and configuration in the quotation.
Both require a corrected configuration-specific schedule. They are not assigned as universal values on this page.
Send voltage, frequency, fault level, protection study, reclosing policy, control-power requirements, communication specification and installation details.
