MPP-LBS Automatic Sectionalizer

Sectionalize distribution feeders with an MPP-LBS load switch paired with a sectionalizing controller. Select the voltage version and coordinate the control logic with upstream protection, the feeder layout and the required automation interfaces.

MPP-LBS SERIES LOAD SWITCH WITH SECTIONALIZING CONTROL

MPP-LBS Automatic Sectionalizer

Sectionalize distribution feeders with an MPP-LBS load switch paired with a sectionalizing controller. Select the voltage version and coordinate the control logic with upstream protection, the feeder layout and the required automation interfaces.

Voltage versions
12 / 24 / 38 kV
Rated current
630 A
Switch medium
SF6
Control duty
Automatic sectionalizing
OVERVIEW

Load switch and sectionalizing controller

The MPP-LBS automatic-sectionalizer configuration pairs the load switch with a sectionalizing controller. The selected controller and operating logic define how the package responds within the feeder protection scheme. Specify the voltage version, sensing inputs, auxiliary supply and communications together. Confirm switching and withstand duties for that version and coordinate operation with the upstream protective device.

TECHNICAL DATA

MPP-LBS technical specifications.

Electrical ratings

MPP-LBS electrical ratings
Electrical parameterSpecification
Product configurationMPP-LBS load switch with sectionalizing controller
Voltage versions12 / 24 / 38 kV
Rated current630 A
Operating modesManual / electric / automatic, by selected configuration
Insulation and interruption mediumSF6 switch arrangement
Short-time withstand dutyObtain the confirmed voltage-specific current and duration
Insulation levelsObtain the confirmed voltage-specific schedule
Control coordinationDefine operating logic, reset and loss-of-voltage behavior

Confirm the selected assembly, component ratings and verification documents. Family options do not describe every supplied configuration.

Configuration options

Match the equipment configuration to the circuit duty and installation interfaces.

MPP-LBS functional-unit options
Selection itemSpecification / requirement
Switch bodySelect the voltage version and mechanical installation
Sectionalizing controllerAgree the control type, logic and pairing with the switch
Sensing and signalsDefine voltage/current inputs and indication requirements
Local controlSpecify manual and electrical operating interfaces
Automation interfaceConfirm the required terminal, protocol and communications equipment

The sectionalizing controller is essential to the automatic-sectionalizer scope. A plain MPP-LBS switch without the agreed control package is a different configuration.

mpp lbs controller.webp

Protection & operation

Upstream coordination

Define the required behavior with upstream protective devices and the feeder operating sequence.

Sectionalizing logic

Confirm counting or timing logic where used, reset conditions, voltage-loss response and blocking rules.

Fault-duty boundary

A short-time withstand value does not establish short-circuit breaking duty. Verify the required switching duty for the selected package.

The load break switch duty guide separates normal-load interruption, isolation and fault-clearing requirements.

Automation functions

Agree remote commands, indications and protocols only for the selected control equipment.

Functional overview only. Qualified personnel must follow the approved isolation procedures and supplied operating instructions.

Define the equipment configuration.

Define the equipment duty and interfaces before requesting the project configuration.

MPP-LBS configuration requirements
Configuration itemPurposeDefine for your project
Load-switch bodyPerform the selected switching dutyVoltage, current and verified withstand schedule
Sectionalizing controlApply the agreed feeder isolation logicUpstream coordination, timing and reset
SensingProvide inputs to the selected controlSensor type, ratios and signal requirements
CommunicationConnect automation where requiredProtocol, ports and remote functions
Installation accessoriesComplete the mechanical and electrical interfacesBrackets, cables, connectors and power supply

Final components and scope of supply are defined in the project quotation.

Dimensions & interfaces

MPP-LBS cabinet dimensions
InterfaceReference / requirementSelection note
Pole attachmentConfirm the selected bracket and support detailsProvide pole geometry and installation height
Terminals and clearancesConfirm the voltage-specific terminal arrangementProvide conductor and clearance requirements
Controller locationConfirm mounting and operating accessDefine switch-to-controller distance
Control cableConfirm cable length, connectors and routingCoordinate support and cable entry
Service accessAllow operation, inspection and controller maintenanceApprove the complete installation arrangement

Use the approved project drawing for dimensions, clearances, foundations and connections.

Installation

Feeder inputs

Send voltage, frequency, load current, fault level, feeder diagram and upstream protection details.

Mounting package

Approve the pole bracket, terminations, controller support and interconnection cable.

Control power

Define supply source, backup requirements and behavior after power loss.

Acceptance checks

Request the switch rating schedule, controller logic description, wiring diagrams and project functional checks.

Site conditions

MPP-LBS site conditions
ConditionRequirement / project input
ApplicationDistribution-feeder sectionalizing and fault-zone isolation
Site environmentState temperature, altitude, pollution and wind or ice conditions
Gas and enclosure dataConfirm filling, monitoring and service requirements for the selected unit
Control supplyDefine normal and backup power requirements
Network coordinationProvide the upstream protection and restoration strategy

Provide any conditions outside the stated range before ordering. Final suitability requires project-specific confirmation.

APPLICATIONS

Where MPP-LBS is used

Distribution feeder sectionalizing

Coordinate the switch-controller package with upstream protection and the intended feeder operating sequence.

Feeder automation integration

Define voltage/current sensing, remote signals, local control and communications for the selected controller.

PLANNING EXAMPLE

Adding a sectionalizing point to a feeder

Planning example: a feeder design includes a controlled sectionalizing point. Its response is agreed with the upstream protection and operating policy.

Describe the feeder sequence

Provide the upstream device settings, feeder layout and required sectionalizing behavior.

Specify the control logic

Agree any counting or timing logic, reset conditions, voltage-loss response and blocking rules.

Confirm the package

Select the switch version, controller, sensing, power supply and wiring, then agree functional verification.

MANUFACTURING & SUPPORT

Production, OEM and quality control

01 / PRODUCTION

Manufacturing

Production follows the approved drawings, the applicable product standards and the agreed inspection plan.

02 / CUSTOMIZATION

OEM & ODM

We can adjust the configuration for your operating environment and provide neutral packaging or your logo. Send the site conditions and branding requirements with your enquiry.

03 / QUALITY

Quality control

Incoming components, production work and finished units are checked against the requirements for the ordered configuration.

Inspection before dispatch

Material inspection

Incoming materials and components are checked against the approved specifications before production.

In-process checks

Assemblies and semi-finished components are inspected at the relevant production stages.

Final inspection

Finished equipment and release records are checked against the approved order requirements.

Factory acceptance testing (FAT). Every unit undergoes FAT before packing. Test items and acceptance criteria follow the product and approved configuration. FAT reports and packing inspection photos accompany the shipment. Factory attendance, video witnessing or independent inspection can be arranged with an agreed scope and schedule.

DOCUMENTS & ENQUIRY

Documents and quotation

Send your required ratings, installation conditions and quantity. We will confirm the configuration and documents for your quotation.

Selected voltage version and coordinated control package.

Sensing, auxiliary power, signals and sectionalizing sequence.

Electrical duty and verification of the agreed control sequence.

Before you request a quote

The automatic-sectionalizer configuration adds a sectionalizing controller and an agreed operating logic. Confirm the switch-controller package and its interfaces.

The duties and control strategy must be specified separately. Coordinate this sectionalizer with upstream protection and confirm any required fault-interruption duty.

No. Select one version and obtain its complete current, insulation and withstand schedule.

These control approaches are described in the supporting product material. The exact controller pairing, logic and interfaces require project confirmation.

Send the feeder diagram, voltage and frequency, load and fault levels, upstream settings, sectionalizing strategy, control supply and communication requirements.