JN15-12 Indoor Earthing Switch

An indoor earthing switch for 12 kV switchgear and maintenance earthing arrangements. This design has reference phase pitches of 210, 230, 250 and 275 mm. Match its mounting geometry, operating shaft and interlocks to the switchgear, then confirm the electrical duty for the selected assembly.

JN15-12 SERIES 12 KV INDOOR EARTHING

JN15-12 Indoor Earthing Switch

An indoor earthing switch for 12 kV switchgear and maintenance earthing arrangements. This design has reference phase pitches of 210, 230, 250 and 275 mm. Match its mounting geometry, operating shaft and interlocks to the switchgear, then confirm the electrical duty for the selected assembly.

Voltage class
12 kV
Reference frequency
50 Hz
Phase-pitch options
210-275 mm
Installation
Indoor
OVERVIEW

Earthing assembly for 12 kV switchgear

JN15-12 provides the earthing-switch component within an indoor switchgear earthing arrangement. The reference design offers several phase pitches, with mounting, shaft and linkage details selected for the panel. Coordinate the switch with the main device, access doors and earth bar. Specify the operating mechanism and any auxiliary contacts in the equipment schedule.

Model designation

The two blank fields specify short-time withstand current and short-circuit making current.

J
Earthing switch
N
Indoor
15
Design number
12
Rated voltage (kV)
□
Rated short-time withstand current (kA)
□
Rated short-circuit making current (kA)
TECHNICAL DATA

JN15-12 technical specifications.

Electrical ratings

JN15-12 electrical ratings
Electrical parameterSpecification
Product familyJN15-12 indoor high-voltage earthing switch
System voltage class12 kV and below, within the approved application
Reference frequency50 Hz
ApplicationEarthing arrangement for compatible high-voltage equipment
Short-time current and durationConfirm together on the approved electrical schedule
Peak and making dutiesConfirm for the selected 12 kV assembly
Insulation withstand levelsObtain the corrected model-specific schedule before selection
Operating driveSpecify the required arrangement; motor operation is not assumed
Voltage indicationA compatible indication arrangement may be specified separately

Confirm the selected assembly, component ratings and verification documents. Family options do not describe every supplied configuration.

Operating arrangement

Specify the drive interface, operating position and interlocks with the switchgear layout. The switch is one component of the complete earthing arrangement.

JN15-12 functional-unit options
Selection itemDefine for the ordered assembly
Operating driveSpecify manual operation or a separately confirmed motor-drive package; no motor is assumed.
Shaft and linkageConfirm shaft projection, coupling, travel and the side from which the mechanism is operated.
Mechanical interlocksCoordinate the earthing switch with the main switching device, access doors and any withdrawable truck.
Position indicationDefine local indication and any auxiliary contacts required by the control scheme.
Earth connectionSpecify the conductor interface and connection to the assembly earth bar.

A mechanism, motor kit, voltage indicator or auxiliary switch is included only when it appears in the agreed bill of materials.

Operation & interlocks

Earthing function

Use the switch within the approved earthing and interlocking scheme for the equipment being maintained.

Switching duties

An earthing switch is not a substitute for a load-break switch or a circuit breaker. Check the making and withstand duties separately.

Access coordination

Confirm the permitted positions of the earthing switch, main switch and access doors in the project interlock schedule.

Commissioning records

Request the operating instructions, interlock verification record and electrical schedule for the delivered assembly.

Functional overview only. Qualified personnel must follow the approved isolation procedures and supplied operating instructions.

Define the equipment configuration.

Define the equipment duty and interfaces before requesting the project configuration.

JN15-12 configuration requirements
Configuration itemPurposeDefine for your project
Electrical dutySelect the applicable earthing-switch dutySystem voltage, frequency, prospective fault current and required duration
Mechanical layoutMatch the equipment interfacesPhase spacing, mounting drawing, shaft location and available clearance
Operating mechanismDefine what is deliveredOperating side, drive type, coupling and any confirmed accessories
Interlock schemeCoordinate access and switching positionsMain-device type, truck position if applicable, doors and auxiliary contacts
DocumentationCheck the selected assembly before manufactureApproved drawing, nameplate schedule, inspection records and operating instructions

Final components and scope of supply are defined in the project quotation.

Dimensions & interfaces

JN15-12 cabinet dimensions
Reference variantL overall length (mm)E phase pitch (mm)C dimension (mm)
JN15-12/31.5-210655210516
JN15-12/31.5-230710230556
JN15-12/31.5-250760250596
JN15-12/31.5-275810275646

Reference mechanical variants only. The /31.5 marking in a dimension code does not by itself confirm the complete withstand duty or duration. Dimensions are in mm; use the approved drawing.

yuli jn15 outline

Installation

Mounting interface

Check the selected phase spacing, hole pattern, mechanism envelope and shaft position against the approved assembly drawing.

Clearances

Coordinate the switch, busbars, cables and enclosure using the required insulation clearances for the selected voltage class.

Earth-bar connection

Confirm the connection size, termination details and assembly instructions with the switchgear design.

Inspection access

Allow access for the specified inspection and maintenance work without relying on the reference image as an installation drawing.

Site conditions

JN15-12 site conditions
ConditionRequirement / project input
LocationIndoor, within the selected equipment arrangement
Reference altitudeUp to 1000 m; confirm higher-altitude applications
Ambient temperatureSpecify the site minimum and maximum for written confirmation
Contamination and condensationDefine exposure and the enclosing equipment conditions
Vibration and seismic dutyProvide the project requirement for verification

Provide any conditions outside the stated range before ordering. Final suitability requires project-specific confirmation.

APPLICATIONS

Where JN15-12 is used

Indoor switchgear earthing

Match the switch and its earth connection to the panel layout and approved interlock scheme.

Replacement of an existing assembly

Use the installed mounting pattern, phase pitch, operating shaft and contact positions to select the replacement.

PLANNING EXAMPLE

Replacing a panel earthing switch

Planning example: a panel needs a replacement JN15-12 assembly. Matching the model prefix is only the starting point for the review.

Record the physical interfaces

Provide the installed switch nameplate, phase pitch, mounting dimensions and operating-side arrangement.

Confirm the electrical schedule

Request the corrected schedule for the selected unit, including insulation, making and withstand duties.

Review operation and access

Match the shaft, linkage and auxiliary contacts to the panel interlock and earthing scheme.

MANUFACTURING & SUPPORT

Production, OEM and quality control

01 / PRODUCTION

Manufacturing

Production follows the approved drawings, the applicable product standards and the agreed inspection plan.

02 / CUSTOMIZATION

OEM & ODM

We can adjust the configuration for your operating environment and provide neutral packaging or your logo. Send the site conditions and branding requirements with your enquiry.

03 / QUALITY

Quality control

Incoming components, production work and finished units are checked against the requirements for the ordered configuration.

Inspection before dispatch

Material inspection

Incoming materials and components are checked against the approved specifications before production.

In-process checks

Assemblies and semi-finished components are inspected at the relevant production stages.

Final inspection

Finished equipment and release records are checked against the approved order requirements.

Factory acceptance testing (FAT). Every unit undergoes FAT before packing. Test items and acceptance criteria follow the product and approved configuration. FAT reports and packing inspection photos accompany the shipment. Factory attendance, video witnessing or independent inspection can be arranged with an agreed scope and schedule.

DOCUMENTS & ENQUIRY

Documents and quotation

Send your required ratings, installation conditions and quantity. We will confirm the configuration and documents for your quotation.

Insulation, making and withstand duties for the selected unit.

Phase pitch, fixing points, shaft and linkage.

Operating instructions and applicable verification.

Before you request a quote

No. Match the mounting pattern, phase pitch, shaft and clearances. A shared model prefix does not establish a drop-in replacement.

The reference drawing lists E = 210, 230, 250 and 275 mm. Their overall lengths and C dimensions are shown in the table.

The short-circuit and insulation ratings are not yet confirmed for the selected assembly. Request the approved model-specific electrical schedule before selection.

Neither is assumed. Specify the operating arrangement and any compatible indication or auxiliary-contact package in the order.

Provide the existing nameplate, mounting drawing, phase pitch, operating-shaft details, interlock arrangement and required electrical duty.