An indoor earthing-switch family identified for 24 kV three-phase AC systems. Coordinate phase spacing, contact position and the operating-shaft interface with the switchgear. The complete nameplate designation and selected mounting variant must be confirmed together before ordering.
An indoor earthing-switch family identified for 24 kV three-phase AC systems. Coordinate phase spacing, contact position and the operating-shaft interface with the switchgear. The complete nameplate designation and selected mounting variant must be confirmed together before ordering.
The JN15-24/31.5 family is listed for indoor 24 kV equipment. Phase spacing, contact position and the operating shaft must fit the cabinet earthing and insulation layout. Approve the complete order designation and selected outline together. The mechanism, auxiliary contacts and interlocks are defined with the cabinet configuration.
| Electrical parameter | Specification |
|---|---|
| Product-family heading | JN15-24/31.5 combined indoor earthing switch |
| Application voltage | 24 kV |
| Supply system | Three-phase AC |
| Reference frequency | 50 / 60 Hz |
| Model-code short-time withstand current | 31.5 kA; duration requires confirmation |
| Complete order designation | Confirm the model suffix on the approved drawing and nameplate |
| Peak and making duties | Confirm on the selected assembly electrical schedule |
| Insulation withstand levels | Obtain model-specific values; do not reuse the 12 kV schedule |
| Drive and interlocks | Select with the complete equipment arrangement |
Confirm the selected assembly, component ratings and verification documents. Family options do not describe every supplied configuration.
Specify the drive interface, operating position and interlocks with the switchgear layout. The switch is one component of the complete earthing arrangement.
| Selection item | Define for the ordered assembly |
|---|---|
| Operating drive | Specify manual operation or a separately confirmed motor-drive package; no motor is assumed. |
| Shaft and linkage | Confirm shaft projection, coupling, travel and the side from which the mechanism is operated. |
| Mechanical interlocks | Coordinate the earthing switch with the main switching device, access doors and any withdrawable truck. |
| Position indication | Define local indication and any auxiliary contacts required by the control scheme. |
| Earth connection | Specify the conductor interface and connection to the assembly earth bar. |
A mechanism, motor kit, voltage indicator or auxiliary switch is included only when it appears in the agreed bill of materials.
Use the switch within the approved earthing and interlocking scheme for the equipment being maintained.
An earthing switch is not a substitute for a load-break switch or a circuit breaker. Check the making and withstand duties separately.
Confirm the permitted positions of the earthing switch, main switch and access doors in the project interlock schedule.
Request the operating instructions, interlock verification record and electrical schedule for the delivered assembly.
Functional overview only. Qualified personnel must follow the approved isolation procedures and supplied operating instructions.
Define the equipment duty and interfaces before requesting the project configuration.
| Configuration item | Purpose | Define for your project |
|---|---|---|
| Electrical duty | Select the applicable earthing-switch duty | System voltage, frequency, prospective fault current and required duration |
| Mechanical layout | Match the equipment interfaces | Phase spacing, mounting drawing, shaft location and available clearance |
| Operating mechanism | Define what is delivered | Operating side, drive type, coupling and any confirmed accessories |
| Interlock scheme | Coordinate access and switching positions | Main-device type, truck position if applicable, doors and auxiliary contacts |
| Documentation | Check the selected assembly before manufacture | Approved drawing, nameplate schedule, inspection records and operating instructions |
Final components and scope of supply are defined in the project quotation.
| Reference E pitch (mm) | H dimension (mm) | D dimension (mm) | Order check |
|---|---|---|---|
| 210 | 655 | 516 | Confirm complete drawing and suffix |
| 220 | 735 | 536 | Verify H value on approved drawing |
| 230 | 810 | 556 | Verify H value on approved drawing |
| 250 | 810 | 596 | Verify H value on approved drawing |
| 275 | 810 | 646 | Confirm complete drawing and suffix |
The 24 kV reference drawing lists these dimensions, but the schedule uses a different model prefix and repeated H values. They are quotation references only. Obtain a corrected, approved outline before fabrication or installation.
Check the selected phase spacing, hole pattern, mechanism envelope and shaft position against the approved assembly drawing.
Coordinate the switch, busbars, cables and enclosure using the required insulation clearances for the selected voltage class.
Confirm the connection size, termination details and assembly instructions with the switchgear design.
Allow access for the specified inspection and maintenance work without relying on the reference image as an installation drawing.
| Condition | Requirement / project input |
|---|---|
| Location | Indoor |
| Reference altitude | Up to 1000 m; confirm the selected application |
| Ambient temperature | Provide site minimum and maximum for written confirmation |
| Humidity reference | Daily average up to 95% |
| Environmental exposure | State condensation, contamination, vibration and any special enclosure conditions |
Provide any conditions outside the stated range before ordering. Final suitability requires project-specific confirmation.
Coordinate the contact positions, clearances and mechanism interface with the panel design.
Check the installed geometry and electrical duty before selecting a mounting variant.
Planning example: the panel layout fixes the phase spacing and operating-shaft position. A confirmed drawing and order code are needed for that assembly.
Obtain one confirmed model designation tied to the selected dimensions and electrical schedule.
Review contacts, mounting, shaft, linkage and insulation clearances against the cabinet drawing.
Define earth connection, indication and interlocks with the main device and access doors.
Production follows the approved drawings, the applicable product standards and the agreed inspection plan.
We can adjust the configuration for your operating environment and provide neutral packaging or your logo. Send the site conditions and branding requirements with your enquiry.
Incoming components, production work and finished units are checked against the requirements for the ordered configuration.
Incoming materials and components are checked against the approved specifications before production.
Assemblies and semi-finished components are inspected at the relevant production stages.
Finished equipment and release records are checked against the approved order requirements.
Factory acceptance testing (FAT). Every unit undergoes FAT before packing. Test items and acceptance criteria follow the product and approved configuration. FAT reports and packing inspection photos accompany the shipment. Factory attendance, video witnessing or independent inspection can be arranged with an agreed scope and schedule.
Send your required ratings, installation conditions and quantity. We will confirm the configuration and documents for your quotation.
One order code linked to its electrical schedule.
Selected phase pitch, dimensions and shaft interface.
Applicable making, withstand and operating verification.
The complete designation must match the approved electrical schedule and outline drawing for the selected assembly. Confirm these together before ordering.
No. A higher voltage class does not establish mechanical interchangeability. Check contact position, phase spacing, shaft details and insulation clearance.
No. The listed H dimensions are reference values and are not yet confirmed for the selected mounting variant. Obtain the approved model-specific drawing before planning the installation.
It identifies a model-code current value. The required duration, peak withstand and making duty must be established separately.
Send the system voltage and frequency, fault-current duration, switchgear layout, selected phase pitch, operating-shaft details and required interlock sequence.